Projects.

Silverthorne Lane, Bristol

Client: HG Construction
Value: £9.5m

4no RC concrete structures

Friary Court

Client: McAleer & Rushe Ltd
Value: £6.0m

Description of Package: 

Purpose built student accommodation scheme to provide over 700 student residences in a 21-storey building with basement.

The development will also become the new permanent home to London’s Migration Museum, a purpose built space spanning 30,000 sq ft to be located on the lower 3 floors.

• Groundworks
Structural Underpinning
Piling Attendance
Drainage
Waterproofing
RC Foundations
RC Frame
• Slipform RC Cores
• Temporary Works

 

Plot 6 Silverthorne Lane, Bristol

Client: HG Construction
Value: £9.2m
5no blocks of Student Accommodation rising to 15 Floors in Central Bristol.

• Groundworks
• Piling Mat
• Piling Attendance
• Drainage
• Waterproofing
• RC Foundations
• RC Frame
• Temporary Works

 

Hub By Premier Inn, Snow Hill

Client: Gilbert-Ash
Value: £3.5m

219 Bed Premier Inn on the site of the former Snow Hill Police Station. A logistically challenging project, within an extensive retained facade. Temporary propping was part of our package to allow the repositioning of the Tower Crane on top of the RC Core during the project.

• Groundworks
• Piling Attendance
• Drainage
Waterproofing
RC Foundations
RC Frame
Jumpform RC Cores
• Temporary Works

268 Vauxhall Bridge Road

Client: Gilbert-Ash
Value: £1.7m

114 Bedroom Hotel development over 7 upper levels over a busy pedestrian walkway & main road.

• RC Frame
RC Cores
Catchfan System
Temporary Works

Barnfield College Phase 2, Luton

Client: Gilbert-Ash
Value: £4.2m

High specification finished concrete across 4no high level floors in a brand new school building. We are very proud of the concrete finish here, which has attracted positive comments from Clients.

• Groundworks
• Piling Mat
• Piling Attendance
• Drainage
• Waterproofing
• RC Foundations
• RC Frame
• Temporary Works
• External Works

Glengall Road, Peckham

Client: HG Construction
Value: £7m

170 residential apartments built over four blocks, with commercial space on the ground and first floors. Temporary works designed to retained façade. Over 1500t of rebar.

• Groundworks
• Piling Mat
• Piling Attendance
• Drainage
• Waterproofing
• RC Foundations
• RC Frame – 13 floors
• Temporary Works

The Bishop’s Avenue, East Finchley

Client: Sheen Lane
Value: £1.5m

Basement, Ground floor and Cores over 3no floors. Extremely logistically challenging project where all deliveries planned ‘just in time’ due to limited storage on site. We safely constructed a three storey lift and stair core using specially procured lightweight shutter panels as there was no crane on site.

Chiswick High Road, London

Client: HG Construction
Value: £4.5m

New build and refurbishment project, involving a two storey extension to an existing building. Four RC blocks between seven and five storeys. Our works involved logistically challenging deep drainage to a road completed at the end of our works on site.

Ebury Bridge Road, London

Client: Gilbert-Ash
Value: £2.5m

Basement, Ground floor and six storey RC frame in a logistically challenging site near Victoria. We provided all temporary works to the basement and managed a tight schedule with all materials delivered ‘just in time’.

40 Eastbourne Terrace, London

Client: Gilbert-Ash
Value: £3.5m

Summit’s works included an extension to provide new 4th and 5th floors, a new structure to provide an extension along the Chilworth Mews elevation, an extension to lower ground floors, with additional extension up to the 3rd floor.

Brighton College

Client: Gilbert-Ash
Value: £2.0m

A 400 seat multifunctional theatre, multiple dance and drama studios, state of the art 6th Form Centre, classrooms for English and drama, and space for social gatherings are at the heart of the campus. High specification concrete finishes to stairs, walls and slabs.

University of Brighton

Client: Gilbert-Ash
Value: £4.5m

A new Business School for the University – High specification concrete finishes that our client was very pleased with. We achieved good quality on high level columns, walls and soffits of 6m in height.

Premier Inn, Farringdon

Client: Gilbert-Ash
Value: £2.8m

RC Basement, walls and ground floor and high specification lift & stair cores. Logistically challenging project running over Network Rail and London Underground Infrastructure.

Premier Inn, Camden

Client: Gilbert-Ash
Value: £2.0m

80 bedroom Hotel over a 5 floor RC frame and external works.

7-11 Cavendish Place

Client: Gilbert-Ash

9 Floor Cat A office redevelopment with RC lift and stair core